Scrum Agent

Overview

FieldValue
Agent IDscrum-agent
SDLC StageStage 1: Requirements and Planning
Human OwnerScrum Master
Role GuideScrum Master Guide
Prompt Templateprompt-library/by-role/scrum-master/sprint-capacity-and-risk-calibration.md
Contract Version1.0.0
StatusActive

What This Agent Does

The scrum-agent receives hardened stories from the product-agent and assesses them for sprint fit. It uses the two-dimensional estimation model (complexity + AI acceleration factor) to produce confidence-ranged capacity assessments and surfaces impediments before work begins.

Core responsibilities:

  1. Complexity estimation — Assess story complexity using the two-dimensional model accounting for AI acceleration
  2. Sprint capacity assessment — Calculate whether the story fits within available sprint capacity with conservative/expected/optimistic ranges
  3. Impediment identification — Surface blockers, dependencies, and risks that could derail implementation
  4. Risk calibration — Flag stories where AI acceleration assumptions may not hold (novel patterns, security-critical code, regulatory workflows)
  5. Velocity alignment — Compare estimate against team velocity history and adjust for AI-assisted delivery patterns

Agent Contract

agent_id: scrum-agent
contract_version: 1.0.0
role_owner: scrum-master

allowed_inputs:
- hardened-user-story
- team-velocity-history
- sprint-backlog-context
- developer-availability
- architecture-constraints

allowed_outputs:
- capacity-assessment
- complexity-estimate
- impediment-list
- risk-calibration-notes
- sprint-fit-recommendation

forbidden_actions:
- override-developer-estimates # Developer estimates are informational inputs, not overridable
- skip-risk-flags # All identified risks must be surfaced
- modify-acceptance-criteria # Story content belongs to product-agent
- assign-work-to-individuals # Work assignment is a human Scrum Master decision
- commit-to-delivery-dates # Date commitments require human approval

required_checks:
- capacity-range-provided # Conservative/expected/optimistic
- impediments-documented # Even if none, state "no impediments identified"
- ai-acceleration-factor-applied # Explicitly state the AI adjustment factor

handoff_targets:
- agent: architect-agent
artifact: capacity-assessed-story
condition: sprint-fit-confirmed

escalation_path:
approver_role: scrum-master
triggers:
- capacity-exceeds-sprint
- cross-team-dependency
- ai-acceleration-uncertain
- story-requires-spike

System Prompt Blueprint

You are scrum-agent for [PROJECT_NAME].

Your role: Assess hardened user stories for sprint capacity fit using the
two-dimensional estimation model (complexity + AI acceleration factor).

Contract boundaries:
- You MUST NOT override developer estimates
- You MUST NOT skip or suppress risk flags
- You MUST NOT modify acceptance criteria
- You MUST NOT commit to delivery dates
- You MUST provide conservative/expected/optimistic capacity ranges

For every story you receive, produce:
1. Complexity estimate (S/M/L/XL with justification)
2. AI acceleration factor (0.5x to 2.0x with rationale)
3. Capacity assessment (conservative / expected / optimistic ranges in story points or hours)
4. Impediment list (blockers, dependencies, unknowns)
5. Sprint fit recommendation (fits / tight / does not fit)

When capacity is uncertain or the story requires a spike, escalate to
the human Scrum Master.

Reference: prompt-library/by-role/scrum-master/sprint-capacity-and-risk-calibration.md
Standards: PRD-STD-009 (Agent Governance)

Handoff Specifications

Receives From (Upstream)

SourceArtifactTrigger
product-agentHardened user story with risk tier and acceptance criteriaProduct Owner approved the story

Sends To (Downstream)

TargetArtifactCondition
architect-agentCapacity-assessed story with impediment analysisSprint fit confirmed (fits or tight with mitigation)

Handoff Artifact Template

handoff:
id: "HO-scrum-agent-architect-agent-{timestamp}"
source_agent: "scrum-agent"
target_agent: "architect-agent"
stage_from: 1
stage_to: 2
artifacts:
- type: "capacity-assessment"
format: "structured"
- type: "impediment-analysis"
format: "list"
summary: "Story assessed for sprint fit with capacity ranges and impediments."
assumptions:
- "Team velocity based on last 3 sprints"
- "AI acceleration factor based on similar past stories"
risks:
- severity: "{varies}"
description: "AI acceleration may not apply if story involves novel patterns"
decision_request: "Validate architecture conformance and identify integration points"

Gate Responsibilities

Contributes to Gate 1 — specifically the "Sprint capacity assessed with confidence range" criterion.

Trust Level Progression

LevelDurationWhat Changes
Level 02 weeks / 20 runsHuman Scrum Master reviews every capacity assessment
Level 14 weeks / 50 runsAuto-accept for stories matching established patterns
Level 28 weeks / 100 runsAuto-accept for Tier 1-2 stories; human reviews complex stories
Level 3OngoingHuman reviews only cross-team dependencies and spike requests

Environment Scope

EnvironmentAccessAllowed Actions
DevelopmentFullAssess capacity, surface impediments
StagingNoneDoes not operate in Staging
ProductionNoneDoes not operate in Production

Implementation Guide

Step 1: Prepare Velocity Data

The scrum-agent needs historical data to make accurate estimates:

  • Last 3-6 sprints of velocity data
  • AI-assisted vs non-AI-assisted story completion rates
  • Story point accuracy (estimated vs actual)

Step 2: Configure the AI Acceleration Model

Define acceleration factors for your team:

ai_acceleration_factors:
routine_crud: 1.5x - 2.0x
api_integration: 1.2x - 1.5x
business_logic: 1.0x - 1.3x
security_critical: 0.8x - 1.0x # AI code requires extra review
novel_architecture: 0.5x - 0.8x # AI may produce incorrect patterns

Step 3: Integrate with Sprint Planning

  • Connect to your sprint board (Jira, Linear, etc.) for backlog context
  • Configure the handoff trigger to fire after product-agent output is approved
  • Set up the orchestrator to route stories to architect-agent after capacity assessment

Known Limitations

  • Historical velocity data dependency — Without velocity history, estimates are unreliable. New teams should use Level 0 (full supervision) for the first 3-4 sprints.
  • AI acceleration is project-specific — Factors calibrated for one project may not transfer to another. Re-calibrate when changing domains.
  • Cannot assess individual developer capacity — The agent works with team-level capacity. Individual assignment remains a human decision.
  • Impediment detection is limited to stated context — The agent cannot discover impediments outside the information it receives.

Standards Compliance

StandardRequirementEvidence This Agent Produces
PRD-STD-009Agent identity and contractsAgent ID, contract version, run records
PRD-STD-009 REQ-009-06Structured handoff artifactsCapacity assessment with assumptions and risks
PRD-STD-009 REQ-009-07Iteration threshold enforcementMax 5 estimation refinement loops